Line 19 of the Hangzhou Metro (Chinese: 杭州地铁19号线; pinyin: Hángzhōu dìtiě shíjiǔ hào xiàn) is a rapid transit line in Hangzhou. The line was opened on 22 September 2022.

Description

The line has a length of 59.14 km (36.75 mi), including 47.1 km (29.3 mi) underground section. There are 17 stations on the line, including 13 underground stations and 4 elevated stations. The line uses 6-car Type A rolling stock.

It connects Hangzhou West railway station, Alibaba headquarters, Hangzhou East railway station and Hangzhou Xiaoshan International Airport. The termini are Tiaoxi station and Yongsheng Road station. It crosses the Qiantang River on a rebuilt Road–Railway Bridge with the Konggang Elevated Road (originally S2 Hangzhou–Ningbo Expressway).

Opening timeline

Stations

Rolling stock

See also

  • Hangzhou Metro

Notes

References



Hangzhou Metro Map inat

Hangzhou opens third metro line News Railway Gazette International

Chengdu Metro Line 19 Phase II is Officially Open

Guangzhou,China OCT 1st,2021 Guangzhou Metro Line 18,The line is an

杭州地铁19号线为何局部停运?潮新闻三问三答来解惑杭州新闻中心杭州网